Agent

Month-end close tracker

The close is a checklist held together by chasing. This agent reads the close checklist and the folders the evidence lands in, works out what has arrived and what has not, and drafts the status note. The financial controller approves it before it is posted to the team.

How it runs

Step by step

01

Read the close checklist

The agent takes the checklist your team already uses, in whatever wiki or workbook it lives in, and treats it as the definition of what is due.

02

Match evidence to each item

It looks in the connected folders for the reconciliation, statement or schedule each item expects, and records what it found.

03

Flag the outstanding gaps

Items with nothing attached, or with a document from an earlier period, are listed as outstanding with the owner named.

04

Surface the unresolved questions

Where an item has support but a note says it is still open, the agent carries that note forward instead of marking the item done.

05

Draft the status note

A short note is drafted in your team's format: what is complete, what is outstanding, what is blocked and by whom.

06

The controller approves the note

The financial controller reviews and approves. Only then is the note posted to the finance channel.

The harness

Exactly what this agent can see, touch and change

The same five controls sit behind every ollo agent. These are this one's settings — visible before you build it, not buried in an admin screen afterwards.

Context

What reaches the model

Financial controllers and close managers running a monthly close across several entities or teams, where evidence arrives in different places from different people.

Escalation

When it asks a person

The financial controller approves the status note before it is posted

Applications & Rights

Which tools it uses, and what it may do in each
Google DriveRead only
SharePointRead only
JiraRead only
SlackReadWrites newCreates new records or documents. Never edits, moves or deletes anything that was already there.

Verification

How you know it’s right

Every claim links to the document it came from. A statement the agent cannot cite does not make it into the output — which is what makes the result reviewable in minutes rather than re-read end to end.

Who it’s for

Financial controllers and close managers running a monthly close across several entities or teams, where evidence arrives in different places from different people.

What you’ll need

  • The close checklist in a connected source
  • The folders where evidence is filed
  • A named owner per checklist item
  • A controller to approve the note

What you get

  • A checklist status view
  • An outstanding items list with owners
  • A drafted close status note

What it doesn’t do

It tracks and reports on the close. It does not post journals, sign off a reconciliation, or judge whether the support it found is sufficient. A person still reviews the evidence.

How you get it

We build the first one with you

Not a template you configure alone. We sit with your team, build it on real data, and hand over the controls.

01

Scope

One session with the people who actually do the work. We agree what the agent reads, what it may write, and who approves.

02

Co-build

Built on your own data, not a sandbox. You watch it being made, so you know why it behaves the way it does.

03

Handover

You own the controls. Change the context, tighten the rights, move the approval gate — without coming back to us.

What it replaces

Parts of the work currently spread across the categories below. It does not replace any of those products outright.

Chasing close items by direct messageManual status spreadsheetsRebuilding the same status note daily
Estimated savingNot setNo figure ships until someone at ollo owns it and the method behind it.

Frequently asked

Does it decide whether an item is complete?

No. It reports what it can see: an expected document that is present, absent, or from the wrong period. Whether the support is good enough is the reviewer's call, and the agent never marks an item signed off.

Our checklist lives in a spreadsheet. Is that a problem?

Not as long as it sits in a connected drive. We map the columns during the co-build so the agent reads your checklist, rather than asking your team to adopt a new one mid-close.

What about entities that close on different days?

Each entity keeps its own checklist and calendar, and the note can be produced per entity or combined. Where the agent could not see evidence for an entity, it says so rather than reporting a single blended position.

Can it chase people directly?

It drafts the chase and names the owner, and the controller decides whether it goes out. Teams usually start with a single note in one channel and add direct chasing later, once they trust what it flags.

Let's Build

AI is a capability you build. Let's build it together.

30 minutes with our team and you'll leave with a real plan — not a sales pitch.