Working paper review
First review is where a manager spends an evening writing points that are largely the same points as last time. This agent works through the prepared file against your own review programme and returns the list: figures without support, schedules that disagree, cross-references that go nowhere, treatments that differ from last year without an explanation. The reviewer's judgement is untouched.
Step by step
Connect the engagement file
The current working papers, the prior year file and the schedules behind them, connected read-only.
Load your review programme
The firm's own review points and file standards become the agent's checklist. It brings no methodology of its own.
It reads the file through
Every working paper in scope is read, not sampled, and each figure is traced to whatever supports it.
It lists the exceptions
Unsupported figures, disagreements between schedules and broken cross-references come back with the paper referenced.
It compares with last year
Treatments that changed without an explanation on file are raised as questions, not corrected.
The review manager approves
The list goes to the preparer only after the review manager has read it, removed the noise and added their own points.
Exactly what this agent can see, touch and change
The same five controls sit behind every Askollo agent. These are this one's settings — visible before you build it, not buried in an admin screen afterwards.
Context
What reaches the modelManagers carrying first review across a portfolio, and firms where review points arrive late because the reviewing is done last.
Escalation
When it asks a personThe review manager approves the list before it is raised with the preparer
Applications & Rights
Which tools it uses, and what it may do in eachVerification
How you know it’s rightEvery claim links to the document it came from. A statement the agent cannot cite does not make it into the output — which is what makes the result reviewable in minutes rather than re-read end to end.
Who it’s for
Managers carrying first review across a portfolio, and firms where review points arrive late because the reviewing is done last.
What you’ll need
- Current and prior year files connected
- Your review programme supplied
- A location for the points list
- A review manager to approve
What you get
- A list of review points per file
- A link to the paper behind each point
- A list of unexplained changes from last year
What it doesn’t do
It is not the reviewer of record. It does not sign a file, form an opinion or take responsibility for the work, and a point it fails to raise does not shift accountability anywhere.
We build the first one with you
Not a template you configure alone. We sit with your team, build it on real data, and hand over the controls.
Scope
One session with the people who actually do the work. We agree what the agent reads, what it may write, and who approves.
Co-build
Built on your own data, not a sandbox. You watch it being made, so you know why it behaves the way it does.
Handover
You own the controls. Change the context, tighten the rights, move the approval gate — without coming back to us.
Parts of the work currently spread across the categories below. It does not replace any of those products outright.
Frequently asked
Does this replace the reviewer?
No, and any tool claiming otherwise should be treated carefully. It does the mechanical pass a reviewer would otherwise do late at night, so the reviewer's time goes on judgement. The file is still signed by a person who has looked at it.
What kind of points does it actually find?
The unglamorous ones: a figure with no supporting schedule, two papers that disagree, a cross-reference pointing at nothing, a treatment that changed silently. These are the points that clog a review and they are exactly the points a careful reader catches.
Can it check arithmetic?
It checks what the documents state against each other. It does not recompute a position or re-perform a calculation in a system it cannot see, and it says so rather than implying a check it did not do.
Where does the list end up?
In a drafting location you choose, and it reaches the preparer only after the manager approves. That ordering matters: a raw machine list handed straight to a junior would be demoralising and often wrong.